Tanzania for investors and backers: concessions for gold and diamond mines

Tanzania for investors and backers: concessions for gold and diamond mines

Tanzania investitori finanziatori miniere d'oro, giacimenti auriferi, concessioni aurifere, concessione aurifera

Tanzania: opportunities in MINING sectors for international investors and backers; gold mines, gold deposits, gold concessions, diamonds

OBJECTIVE

International investors and backers are sought for a project in Tanzania involving gold. Attached and detailed documents concerning a complete Business Plan and feasibility studies are available subject to subscription NDA (NON-DISCLOSURE AGREEMENT). It is also possible to obtain a concession in a 45 sq km area in Tanzania with diamond deposits; nonetheless, it is not possible to publish any of this information in this document, thus we require that you register as a reliable spokesperson by CONTACTING US

LINK TANZANIA COUNTRY SHEET

LINK IBS DESK

GOLD MINING PROJECT IN TANZANIA

INTRODUCTION

Your new company will establish in Tanzania, in order to undertake a gold mining project in Matinje and Kilabili, two towns in the Igunga District in the Tabora Region and Shinyanga.
The plant will be located next to the villagae of Matinje – Kilabili, in the area covererd by PML, which will be bought or leased by the new society.

Mining equipment include:

- Processing plant. + Knelson C + Add. Ball M. + Chemical Laboratory;
- Lorry (ies) with cranes (10 tons) and dumpers;
- 4×4 Car (s) + Van to transport employees;
- Shovels+ excavator;
- Fork lift + equipment + tools;
- Cisterns for diesel;
- N°10 kits for mechanizing shafts: jackhammer, compressors, bits, ventilation equipment, elevator hoists, water pumps, portable generators, security kits, and more;
- N°10 Water deposit cisterns;
- 20 tons lorries;
- 200 Kw generators with control panels;
- Core drill;
- 15/20 t Crane;
- Technical, geological, sanitary, security and environmental impact equipment.

The project will produce an income for both the producers and the inhabitants of the area interested in it: it will revamp local economy by creating new vacancies and strengthen trade, which is linked to the mining sector. Technical services, geological and geochemical studies, along with surveys, drillings, mining activities planning, security, environment and health management will be exclusively managed by the new society. Through an environment-friendly plan, there will not be major environmental impact. Leaching with iodine will be used, instead of the cyanide-based one that multinational corporation prefer: this process is more affordable and environment-friendly. The project will have positive economic and social outcome.

HOW TO ACHIEVE THIS PROJECT

The main goal is to seize a business and an investment opportunity: there are three different ways to fulfil the project development procedures and its objectives. Those can be combined.

OPTION N° 1 – “FINANCIAL” EXPLOITING

Financial exploiting will start by choosing the right gold deposits: they will be chosen through geological studies, satellite and air collections of data and geophysical survey, sampling and laboratory testing. Secondly, Report of Resources will be drawn, and afterwards edited by specialized societies ( S.G.S Switzerland, OMAC Northern Ireland, etcetera. ); finally, specific certificates will be issued as credit lines for financial management on platforms. This will take up to 10 to 12 months, if liquid assets still exist; the minimum expenditure for the investment is 3 million euros average. The certificates may be inserted in the Stock Exchange, thus be sold to potential investors, with high investment returns.

OPTION N° 2 – MINING MINERALS

Certificates enable the investor to extract, process and trade gold, besides financial exploiting through underground trenching and vertical shafts complete with mechanization kits (open pit or open-air extraction included). Should the investor be interested in extraction, the project provides to a further minimum investment of 3 million euros average, with an implementation period of 10 – 12 months if liquid assets exist. A iodine-based processing system will eliminate the risk of the cyanide system, which has traditionally been used by big companies operating in this field: it involves cyanidation and mercury, both highly toxic elements which cause serious illnesses and deadly environmental impact.

OPTION N° 3 – EXPLOITING CONCESSIONS ALREADY ANALIZED

This third option might allow taking advantage of concessions that have already been “analyzed” through open vertical shafts and existing lodes of gold, which have been previously assigned to local miners. We may buy those concessions, or get in a JV Joint-Venture; it will be given to the new society at least 90-95% of the value, seen the financial investment brought to the project. Any of these options will guarantee tangible return in a very short time, because the product is paid on delivery after verification; the compound return benefits from such quickness.

FURTHER INFORMATION ON THE MINING PROJECT

A FLEXIBLE INVESTMENT

The procedure allows planning the investment on its own (geological studies, geophysical survey etc.) releasing the Certificates and using them to financial management on platforms, it also allows creating a start-up for excavation, processing and trading products. Thus, it is possible to limit the investment to the Certificates or to pair it to the mining project.

TIMING OF THE INVESTMENT

People may think that the mining sector might be a slow one, nonetheless it is a key feature of the project to capitalize time, so that the whole investment will last 5 years, which might be hastened to 3 years.
Reducing time can be possible by concentrating the assets at most, realizing increased output and profits.

A PROFITABLE INVESTMENT

Such a profitable investment allows to achieve the expected goals, besides having the best commodity guaranteed and assured by international and global transactions.

QUICK AND TANGIBLE PROFITS

Profits will come quickly, reducing the gap between costs and incomes. This is an advantage in the present globalized system, and it reduces risks in transactions.

OBTAINING BETTER RESULTS COMPARED TO PREVISIONS

In the Feasibility study, which is a decision-making tool for attracting interest to the investment, the values taken into consideration assume a major importance. As regards the business plan and the anticipated profits, a prudential assessment will be drawn, in full respect of the professional ethic.

DIVERSIFICATION AND GENERAL RISK OF THE INVESTMENT

Diversification is included in the Feasibility study and as a strategy “in progress”.

KNOW HOW AND SKILLS

Our Italian customer offers:

- the possibility to obtain several concessions (n. 32 per ha. 41,8) and to get a selected list of additional concessions, which will be verified in order to acquire the best ones;
- ten-year experience, which will allow to speed up African bureaucracy, shortening times and becoming operative rapidly; creating a productive financial start up in a few months’ time, overcoming difficulties that would normally take years to be solved;
- strengthened and prized relationships with professionals of the mining sectors: mining engineers, government geologists and freelancers in the capital city Dar es Salaam;
- all of the best specialists and geologists, along with the Geological Survey of Tanzania will take you and your business into great account; the Geological Survey of Tanzania is the first national authority in terms of geological studies.
- privileged relationship with the Regional Institution of the Ministry of Mines of Shinyanga: this one represents 90% of the national mining sector, and it includes the main multinational companies of this sector, such as Golden Pride, Barrick, Geita, Anglogold and Kahama;
- privileged relationship with the person in charge for this region and with the Principal Geologist of Ministry, both available to collaborate to this project: it will hugely increase its professionalism;
- innovative industrial technology, like the latest-generation iodine systems, which enables the plants to be moved when needed. It also provides for the workers and the small scale miners: they will be working in a much healthier environment and they will benefit both from an economical and a social point of view;
- professionalism is guaranteed; moreover, you will have eight stable trusted partners.

SOME PHOTOS OF THE SYSTEM OF GOLD PROCESSING BY IODINE

1. primary crusher - foto impianto di frantumazione
2. secondary crusher - foto impianto polverizzazione -  mills
3. foto polverizzazione e prima miscelazione
4. foto vasche di decantazione con agitatori
5. foto inizio del filtraggio del materiale aurifero
6. foto filtrazione finale
7. foto procedimento di osmosi inversa
8. foto collegamenti

DOWNLOAD SMALL SCALE MINERS PHOTOS

DOWNLOAD EN – DETAILS PHOTOS SMALL SCALE MINERS